Home
Current Projects
Aicholtz Connector
Beechwood South Extension
Business 28 Phase I
CLE - Clough Pike Widening
CLE - Stonelick-Williams Corner Road Covered Bridge
Eastern Corridor Segment IVa
Eastgate North Frontage Road Improvements
Old SR 74 Widening – Olive Branch-Stonelick to Armstrong Boulevard
SR 28 Corridor Improvements
SR28 Improvements (Castleberry to I-275)
SR 32 East Corridor Study
Tina Drive Extension
Traffic Modeling and Analysis
US 50 Improvements
US 50 - SR 131 and Milford Parkway - Chamber Drive Improvements Project
Wolfpen Pleasant Hill Road Improvements From Allen Drive to SR 131
Actions of the Board
CCTID Board of Trustees
Announcements
Economic Development
Environmental Stewardship
CCTID Regional Transportation Improvement Program
Eastern Corridor Reference
Environmental Red Flag Reports
Links
Contact Us
CLE - Stonelick-Williams Corner Road Covered Bridge
Open House
Open House 12-21-09 – this PowerPoint has 8 displays that were used in the second open house
Download PDF
Download Office 2010 PowerPoint
PI Meeting #2 Responses
- PDF – A sign in sheet and comment sheets at the second PI meeting
MEC Revised 12-1-09 CP Letter CLE-Stonelick
- PDF – ODOT letter with summary from PI meetings and invitation to public for Section 106
More Downloads
Location Map
(PDF)
Application to State
(PDF)
Design Scope of Services
(PDF)
Environmental Scope
(PDF)
CLE - Stonelick-Williams Corner Rd. Covered Bridge
CLE - Clough Pike Widening
Project Map
(PDF)
Base Map DWG File
Additional Base Mapping Files
(Zipped File)