Click here to visit the Clermont County, Ohio Portal
Navigation
  • Home
  • Current Projects
    • Aicholtz Connector
    • Beechwood South Extension
    • Business 28 Phase I
      • Business 28 - Phase 1 Improvements from Bypass State Route 28 to Cook Road
    • CLE - Clough Pike Widening
    • CLE - Stonelick-Williams Corner Road Covered Bridge
    • Eastern Corridor Segment IVa
    • Eastgate North Frontage Road Improvements
    • SR 28 Corridor Improvements
    • SR28 Improvements (Castleberry to I-275)
    • SR 32 East Corridor Study
    • US 50 Improvements
    • US 50 - SR 131 and Milford Parkway - Chamber Drive Improvements Project
    • Wolfpen Pleasant Hill Road Improvements From Allen Drive to SR 131
  • Actions of the Board
  • CCTID Board of Trustees
  • Announcements
  • Economic Development
  • Environmental Stewardship
  • CCTID Regional Transportation Improvement Program
  • Eastern Corridor Reference
  • Environmental Red Flag Reports
  • Links
  • Contact Us

Business 28 - Phase 1 Improvements

Business 28 – Phase 1 Improvements

This project is located in Miami Township in northwestern Clermont County. The project begins at the intersection of Business 28 and State Route 28 (former Bypass SR 28) and ends at approximately 200 feet west of Cook Road. The proposed project improvements include widening Business 28, the addition of sidewalks, utility relocation and consolidation, plus upgrades in traffic control, traffic signals, and drainage.

A five-lane boulevard section with a 6-foot sidewalk on each side of the roadway will be provided from Bypass 28 to Cinema Drive, with a 7-feet grass strip will separating the sidewalk from the road. From Cinema Drive to Cook Road, a three-lane section with a 6-foot sidewalk, located at the back of curb, will be provided. 

Access points along SR 28 will be reconstructed at current locations. Properties with multiple access points will be reduced to minimize curb cuts and improve access management. Decorative lighting and landscaping will be used to enhance the corridor appearance. Improvements will also include utility relocation, new closed storm sewer system, and upgrades in traffic control and traffic signal(s). In addition, one (1) offset intersection condition will be eliminated with this improvement – Orchard Lake Drive will be realigned to match Cook Road.

The proposed improvements will add many features that will enhance the future safety of the motoring public, reduce delays, and increase the overall operation of the roadway and improve the corridor appearance, without having any negative impacts on the surrounding area.

The addition of the exclusive left turn lane will reduce delays to through vehicles caused by the turning vehicles and reduce accidents related to the turning. The left turn lane will also provide a protected location for turning vehicles to wait for a gap in opposing traffic. This reduces the potential for collisions from the rear and also may encourage drivers of left turning vehicles to wait for adequate gaps in opposing traffic before turning.

Downloads

  • Business 28 - Phase 1 Improvements from Bypass 28 to Cook Road - (907 KB PDF)


More Information

  • Read the February 18, 2008 News Release
Copyright © 2009 Clermont County, Ohio. All Rights Reserved. Home | Privacy Policy | Contact Us